Wharf Collective’s “a wave, still here”
Explore the beauty of Cherry Street Pier from the perspective of members of the Wharf Collective in a wave, still here, a site-specific exhibition that is inspired by the long and rich history of the Pier, on display August 6 through August 29.
This exhibition explores the history of a pier that once served as Philadelphia’s front door. The Pier was established in 1919 and it is the only pier in the city with its historic headhouse still intact. Just as water remembers the movement of ships traveling across oceans, so does a building carry on its beams the weight of history and time. The artists explore the ways in which memory and history are recorded: through water, sound, and the discarded materials that accumulate throughout the years.
Jennifer Green’s You can’t step in the same river twice, an I-beam coated with an ever-changing image, reveals the vulnerability of the foundations of modernity. Shannon Murphy’s Halfway through, and already over, and Elizabeth Kelly’s Pier No. 9 Cyanotype Study reference the original structure of the Pier through its architectural elements: a building sewn together by hand and an instant memorialized by the archive. These blueprints of the original structures act as portals taking us back to when the Pier served as a marine-railroad terminal and industrial gateway into the city. Em Rea’s No Good Kings, No True Kings chooses to focus on the community surrounding the Pier, creating multi-layered windows with discarded materials collected in the nearby area.
Looking at the Pier’s shifting role over time, the works in this exhibition both challenge and re-envision its present and the histories of the people that inhabit it.
Experience a wave, still here from August 6 through August 29 at Cherry Street Pier.
Learn about our safety enhancements before your next visit.
Review our parking and directions information before your next visit.
Delaware River Trail Construction: Construction for the exciting Delaware River Trail is happening along Columbus Boulevard. The project is making headway and will result in a stunning multi-use trail that will increase accessibility to the Waterfront. The trail is scheduled for completion in Fall 2021.